[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content-query-Yr8xSJxSjx":3},{"_path":4,"_dir":5,"_draft":6,"_partial":6,"_locale":7,"title":8,"description":9,"date":10,"body":11,"_type":1057,"_id":1058,"_source":1059,"_file":1060,"_stem":1061,"_extension":1062},"\u002Fcurrent-affairs\u002Fpm-surya-ghar-muft-bijli-yojana","current-affairs",false,"","PM Surya Ghar Muft Bijli Yojana: Solar Rooftop Subsidies","Comprehensive UPSC notes and analysis on PM Surya Ghar Muft Bijli Yojana: Solar Rooftop Subsidies.","2026-08-11T10:31:07.303Z",{"type":12,"children":13,"toc":1030},"root",[14,22,29,64,84,88,94,101,106,141,146,152,164,215,218,224,234,240,245,327,333,338,356,362,405,408,414,420,474,480,517,523,546,549,555,560,568,574,579,592,598,610,630,636,641,664,670,675,678,684,694,765,770,773,779],{"type":15,"tag":16,"props":17,"children":19},"element","h1",{"id":18},"pm-surya-ghar-muft-bijli-yojana-solar-rooftop-subsidies",[20],{"type":21,"value":8},"text",{"type":15,"tag":23,"props":24,"children":26},"h2",{"id":25},"introduction",[27],{"type":21,"value":28},"Introduction",{"type":15,"tag":30,"props":31,"children":32},"p",{},[33,35,41,43,48,50,55,57,62],{"type":21,"value":34},"The ",{"type":15,"tag":36,"props":37,"children":38},"strong",{},[39],{"type":21,"value":40},"PM Surya Ghar: Muft Bijli Yojana",{"type":21,"value":42}," represents a transformative shift in India's renewable energy policy landscape. Approved by the Union Cabinet in February 2024 with a total financial outlay of ",{"type":15,"tag":36,"props":44,"children":45},{},[46],{"type":21,"value":47},"₹75,021 crore",{"type":21,"value":49},", the flagship central sector scheme aims to install rooftop solar (RTS) systems and provide up to ",{"type":15,"tag":36,"props":51,"children":52},{},[53],{"type":21,"value":54},"300 units of free electricity per month",{"type":21,"value":56}," to ",{"type":15,"tag":36,"props":58,"children":59},{},[60],{"type":21,"value":61},"1 crore (10 million) households",{"type":21,"value":63}," across India.",{"type":15,"tag":30,"props":65,"children":66},{},[67,69,74,76,82],{"type":21,"value":68},"By decentralizing solar power generation, the scheme targets simultaneously reducing the energy burden on domestic consumers, cutting down state distribution companies' (DISCOMs) subsidy burdens, and accelerating India’s transition toward non-fossil fuel energy sources. Spearheaded by the ",{"type":15,"tag":36,"props":70,"children":71},{},[72],{"type":21,"value":73},"Ministry of New and Renewable Energy (MNRE)",{"type":21,"value":75},", the initiative bridges the gap between macro-level climate commitments and grassroots energy access, turning individual households into active participants (",{"type":15,"tag":77,"props":78,"children":79},"em",{},[80],{"type":21,"value":81},"prosumers",{"type":21,"value":83},") in the national energy grid.",{"type":15,"tag":85,"props":86,"children":87},"hr",{},[],{"type":15,"tag":23,"props":89,"children":91},{"id":90},"historical-background-context",[92],{"type":21,"value":93},"Historical Background \u002F Context",{"type":15,"tag":95,"props":96,"children":98},"h3",{"id":97},"evolution-of-rooftop-solar-policy-in-india",[99],{"type":21,"value":100},"Evolution of Rooftop Solar Policy in India",{"type":15,"tag":30,"props":102,"children":103},{},[104],{"type":21,"value":105},"India's rooftop solar journey has historically lagged behind utility-scale ground-mounted solar power development.",{"type":15,"tag":107,"props":108,"children":109},"ol",{},[110,121,131],{"type":15,"tag":111,"props":112,"children":113},"li",{},[114,119],{"type":15,"tag":36,"props":115,"children":116},{},[117],{"type":21,"value":118},"National Solar Mission (2010):",{"type":21,"value":120}," Launched under the National Action Plan on Climate Change (NAPCC), setting the initial baseline for solar energy capacity building.",{"type":15,"tag":111,"props":122,"children":123},{},[124,129],{"type":15,"tag":36,"props":125,"children":126},{},[127],{"type":21,"value":128},"Phase-I Grid Connected Rooftop Solar Programme (2014):",{"type":21,"value":130}," Focused on establishing regulatory framework foundations, pilot projects, and initial institutional structures.",{"type":15,"tag":111,"props":132,"children":133},{},[134,139],{"type":15,"tag":36,"props":135,"children":136},{},[137],{"type":21,"value":138},"Phase-II Grid Connected Rooftop Solar Programme (2019):",{"type":21,"value":140}," Targeted 40 GW of rooftop solar capacity out of a total 100 GW solar target by 2022. It provided Central Financial Assistance (CFA) to DISCOMs to drive rooftop installations. However, implementation suffered due to regulatory delays, net-metering bottlenecks, low consumer awareness, and complex subsidy disbursement channels.",{"type":15,"tag":30,"props":142,"children":143},{},[144],{"type":21,"value":145},"By early 2024, while utility-scale solar had expanded rapidly, total installed rooftop solar capacity hovered around 11–12 GW, with residential installations making up less than 25% of that figure. The bulk of installed rooftop capacity belonged to commercial and industrial (C&I) consumers who leveraged rapid payback periods and high commercial tariffs.",{"type":15,"tag":95,"props":147,"children":149},{"id":148},"global-and-climate-commitments-context",[150],{"type":21,"value":151},"Global and Climate Commitments Context",{"type":15,"tag":30,"props":153,"children":154},{},[155,157,162],{"type":21,"value":156},"The scheme aligns directly with India's international commitments announced at the COP26 summit in Glasgow under the ",{"type":15,"tag":36,"props":158,"children":159},{},[160],{"type":21,"value":161},"Panchamrit",{"type":21,"value":163}," framework:",{"type":15,"tag":165,"props":166,"children":167},"ul",{},[168,180,191,203],{"type":15,"tag":111,"props":169,"children":170},{},[171,173,178],{"type":21,"value":172},"Reaching ",{"type":15,"tag":36,"props":174,"children":175},{},[176],{"type":21,"value":177},"500 GW of non-fossil fuel energy capacity",{"type":21,"value":179}," by 2030.",{"type":15,"tag":111,"props":181,"children":182},{},[183,185,190],{"type":21,"value":184},"Meeting ",{"type":15,"tag":36,"props":186,"children":187},{},[188],{"type":21,"value":189},"50% of energy requirements from renewable energy",{"type":21,"value":179},{"type":15,"tag":111,"props":192,"children":193},{},[194,196,201],{"type":21,"value":195},"Reducing total projected carbon emissions by ",{"type":15,"tag":36,"props":197,"children":198},{},[199],{"type":21,"value":200},"1 billion tonnes",{"type":21,"value":202}," between now and 2030.",{"type":15,"tag":111,"props":204,"children":205},{},[206,208,213],{"type":21,"value":207},"Achieving the ultimate target of ",{"type":15,"tag":36,"props":209,"children":210},{},[211],{"type":21,"value":212},"Net-Zero carbon emissions by 2070",{"type":21,"value":214},".",{"type":15,"tag":85,"props":216,"children":217},{},[],{"type":15,"tag":23,"props":219,"children":221},{"id":220},"key-features-objectives",[222],{"type":21,"value":223},"Key Features \u002F Objectives",{"type":15,"tag":225,"props":226,"children":228},"pre",{"code":227},"+-------------------------------------------------------------------------+\n|                  PM SURYA GHAR: MUFT BIJLI YOJANA                       |\n|                       Total Outlay: ₹75,021 Crore                       |\n+-------------------------------------------------------------------------+\n                                    |\n     +------------------------------+------------------------------+\n     |                                                             |\n[Target Beneficiaries]                                    [Financial Subsidy Structure]\n- 1 Crore (10 Million) Households                         - Up to 2 kW: ₹30,000 \u002F kW (Max ₹60,000)\n- 300 Units Free Electricity\u002FMonth                        - 2 kW to 3 kW: ₹18,000 for 3rd kW\n                                                          - Cap at 3 kW: Maximum ₹78,000\n                                                          - GHS\u002FRWA: ₹18,000\u002FkW up to 500 kW\n                                    |\n     +------------------------------+------------------------------+\n     |                                                             |\n[Enabling Components]                                     [Institutional Framework]\n- Collateral-Free Loans (~7% Interest)                    - Central Nodal Agency: REC Limited\n- Model Solar Villages in Every District                  - Digital Integration: National Portal\n- Incentives for DISCOMs & Urban Local Bodies             - Domestic Content Requirement (DCR)\n",[229],{"type":15,"tag":230,"props":231,"children":232},"code",{"__ignoreMap":7},[233],{"type":21,"value":227},{"type":15,"tag":95,"props":235,"children":237},{"id":236},"core-subsidy-financial-architecture",[238],{"type":21,"value":239},"Core Subsidy & Financial Architecture",{"type":15,"tag":30,"props":241,"children":242},{},[243],{"type":21,"value":244},"The scheme restructures the Central Financial Assistance (CFA) model to provide upfront, direct benefit transfers (DBT) to registered beneficiaries through a unified digital platform.",{"type":15,"tag":165,"props":246,"children":247},{},[248,271,294,310],{"type":15,"tag":111,"props":249,"children":250},{},[251,256,258,263,265,270],{"type":15,"tag":36,"props":252,"children":253},{},[254],{"type":21,"value":255},"For Systems up to 2 kW Capacity:",{"type":21,"value":257}," The Central Government provides a subsidy covering 60% of the benchmark system cost, set at ",{"type":15,"tag":36,"props":259,"children":260},{},[261],{"type":21,"value":262},"₹30,000 per kW",{"type":21,"value":264},". Thus, a 2 kW system receives a maximum direct subsidy of ",{"type":15,"tag":36,"props":266,"children":267},{},[268],{"type":21,"value":269},"₹60,000",{"type":21,"value":214},{"type":15,"tag":111,"props":272,"children":273},{},[274,279,281,286,288,293],{"type":15,"tag":36,"props":275,"children":276},{},[277],{"type":21,"value":278},"For Systems between 2 kW and 3 kW Capacity:",{"type":21,"value":280}," An additional subsidy of 40% of the benchmark cost is provided for capacity above 2 kW, set at ",{"type":15,"tag":36,"props":282,"children":283},{},[284],{"type":21,"value":285},"₹18,000 for the third kW",{"type":21,"value":287},". A 3 kW system qualifies for the maximum total subsidy cap of ",{"type":15,"tag":36,"props":289,"children":290},{},[291],{"type":21,"value":292},"₹78,000",{"type":21,"value":214},{"type":15,"tag":111,"props":295,"children":296},{},[297,302,304,308],{"type":15,"tag":36,"props":298,"children":299},{},[300],{"type":21,"value":301},"For Systems above 3 kW Capacity:",{"type":21,"value":303}," The subsidy remains capped at ",{"type":15,"tag":36,"props":305,"children":306},{},[307],{"type":21,"value":292},{"type":21,"value":309},", though higher capacity systems can still be integrated into the net-metering network.",{"type":15,"tag":111,"props":311,"children":312},{},[313,318,320,325],{"type":15,"tag":36,"props":314,"children":315},{},[316],{"type":21,"value":317},"Group Housing Societies (GHS) and Resident Welfare Associations (RWA):",{"type":21,"value":319}," Subsidy of ",{"type":15,"tag":36,"props":321,"children":322},{},[323],{"type":21,"value":324},"₹18,000 per kW",{"type":21,"value":326}," for common facilities, including EV charging stations and common area lighting, capped up to 500 kW system capacity.",{"type":15,"tag":95,"props":328,"children":330},{"id":329},"concessional-financing",[331],{"type":21,"value":332},"Concessional Financing",{"type":15,"tag":30,"props":334,"children":335},{},[336],{"type":21,"value":337},"To address capital expenditure barriers for lower-middle and middle-income families, the government partnered with scheduled commercial banks to offer:",{"type":15,"tag":165,"props":339,"children":340},{},[341,351],{"type":15,"tag":111,"props":342,"children":343},{},[344,349],{"type":15,"tag":36,"props":345,"children":346},{},[347],{"type":21,"value":348},"Collateral-free loans",{"type":21,"value":350}," at concessional interest rates (benchmarked at ~0.5% above the prevailing RBI Repo Rate, yielding approximately 7% interest).",{"type":15,"tag":111,"props":352,"children":353},{},[354],{"type":21,"value":355},"Simplified approval protocols on the National Portal for systems up to 3 kW capacity.",{"type":15,"tag":95,"props":357,"children":359},{"id":358},"key-operational-components",[360],{"type":21,"value":361},"Key Operational Components",{"type":15,"tag":107,"props":363,"children":364},{},[365,375,385,395],{"type":15,"tag":111,"props":366,"children":367},{},[368,373],{"type":15,"tag":36,"props":369,"children":370},{},[371],{"type":21,"value":372},"National Portal Integration:",{"type":21,"value":374}," A seamless, single-window digital portal handles consumer applications, technical approvals, vendor selection, net-metering requests, and direct subsidy disbursements to bank accounts.",{"type":15,"tag":111,"props":376,"children":377},{},[378,383],{"type":15,"tag":36,"props":379,"children":380},{},[381],{"type":21,"value":382},"Model Solar Villages:",{"type":21,"value":384}," Development of one benchmark Model Solar Village in every district across the country to demonstrate decentralized energy generation benefits and drive rural uptake.",{"type":15,"tag":111,"props":386,"children":387},{},[388,393],{"type":15,"tag":36,"props":389,"children":390},{},[391],{"type":21,"value":392},"DISCOM Incentives:",{"type":21,"value":394}," Financial performance incentives awarded to power distribution companies to speed up net-metering readiness, transformer upgrades, and technical feasibility clearances.",{"type":15,"tag":111,"props":396,"children":397},{},[398,403],{"type":15,"tag":36,"props":399,"children":400},{},[401],{"type":21,"value":402},"Local Body Empowerment:",{"type":21,"value":404}," Urban Local Bodies (ULBs) and Panchayati Raj Institutions (PRIs) receive financial incentives to promote rooftop solar adoption within their jurisdictions.",{"type":15,"tag":85,"props":406,"children":407},{},[],{"type":15,"tag":23,"props":409,"children":411},{"id":410},"significance-for-india",[412],{"type":21,"value":413},"Significance for India",{"type":15,"tag":95,"props":415,"children":417},{"id":416},"economic-impact",[418],{"type":21,"value":419},"Economic Impact",{"type":15,"tag":165,"props":421,"children":422},{},[423,440,450],{"type":15,"tag":111,"props":424,"children":425},{},[426,431,433,438],{"type":15,"tag":36,"props":427,"children":428},{},[429],{"type":21,"value":430},"Reduction in Household Energy Bills:",{"type":21,"value":432}," Households can save between ",{"type":15,"tag":36,"props":434,"children":435},{},[436],{"type":21,"value":437},"₹15,000 to ₹18,000 annually",{"type":21,"value":439}," on electricity costs, while selling surplus generated power back to DISCOMs via net-metering mechanisms.",{"type":15,"tag":111,"props":441,"children":442},{},[443,448],{"type":15,"tag":36,"props":444,"children":445},{},[446],{"type":21,"value":447},"Relief for State DISCOMs:",{"type":21,"value":449}," Residential consumers in lower consumption slabs are heavily subsidized by state governments. Widespread rooftop adoption reduces the quantum of state power subsidies required, easing fiscal stress on state budgets.",{"type":15,"tag":111,"props":451,"children":452},{},[453,458,460,465,467,472],{"type":15,"tag":36,"props":454,"children":455},{},[456],{"type":21,"value":457},"Job Creation and Skill Development:",{"type":21,"value":459}," The initiative is projected to generate roughly ",{"type":15,"tag":36,"props":461,"children":462},{},[463],{"type":21,"value":464},"17 to 18 lakh direct and indirect jobs",{"type":21,"value":466}," spanning solar panel manufacturing, technical sales, installation, inverter maintenance, civil works, and grid management. Programs like ",{"type":15,"tag":77,"props":468,"children":469},{},[470],{"type":21,"value":471},"Suryamitra",{"type":21,"value":473}," train local youth to support this labor demand.",{"type":15,"tag":95,"props":475,"children":477},{"id":476},"environmental-impact",[478],{"type":21,"value":479},"Environmental Impact",{"type":15,"tag":165,"props":481,"children":482},{},[483,507],{"type":15,"tag":111,"props":484,"children":485},{},[486,491,493,498,500,505],{"type":15,"tag":36,"props":487,"children":488},{},[489],{"type":21,"value":490},"Carbon Abatement:",{"type":21,"value":492}," Expected to add approximately ",{"type":15,"tag":36,"props":494,"children":495},{},[496],{"type":21,"value":497},"30 GW",{"type":21,"value":499}," of residential solar capacity, cutting an estimated ",{"type":15,"tag":36,"props":501,"children":502},{},[503],{"type":21,"value":504},"720 million tonnes of CO2 equivalent emissions",{"type":21,"value":506}," over the 25-year operational lifecycle of installed systems.",{"type":15,"tag":111,"props":508,"children":509},{},[510,515],{"type":15,"tag":36,"props":511,"children":512},{},[513],{"type":21,"value":514},"Land Conservation:",{"type":21,"value":516}," Unlike large-scale utility solar projects that require extensive land acquisition (often resulting in agricultural displacement or land-use conflicts), rooftop solar utilizes under-utilized residential roof spaces.",{"type":15,"tag":95,"props":518,"children":520},{"id":519},"energy-security-grid-resilience",[521],{"type":21,"value":522},"Energy Security & Grid Resilience",{"type":15,"tag":165,"props":524,"children":525},{},[526,536],{"type":15,"tag":111,"props":527,"children":528},{},[529,534],{"type":15,"tag":36,"props":530,"children":531},{},[532],{"type":21,"value":533},"Decentralized Generation:",{"type":21,"value":535}," Distributed rooftop solar reduces transmission and distribution (T&D) losses by generating electricity directly at the point of consumption.",{"type":15,"tag":111,"props":537,"children":538},{},[539,544],{"type":15,"tag":36,"props":540,"children":541},{},[542],{"type":21,"value":543},"Peak Load Management:",{"type":21,"value":545}," Mid-day solar generation aligns well with urban cooling demands, shaving off daytime peak loads on central generation plants and regional transmission grids.",{"type":15,"tag":85,"props":547,"children":548},{},[],{"type":15,"tag":23,"props":550,"children":552},{"id":551},"challenges-concerns",[553],{"type":21,"value":554},"Challenges \u002F Concerns",{"type":15,"tag":30,"props":556,"children":557},{},[558],{"type":21,"value":559},"Despite the clear benefits, full-scale implementation faces several structural, financial, and operational challenges:",{"type":15,"tag":225,"props":561,"children":563},{"code":562},"                  CHALLENGES IN IMPLEMENTATION\n                               │\n ┌──────────────────┬──────────┴─────────┬──────────────────┐\n │                  │                    │                  │\n ▼                  ▼                    ▼                  ▼\nDISCOM Resistance   Supply Chain         Grid Capacity      Upfront Capital\n& Loss of High-     Constraints          & Duck Curve       Barriers for EWS\nTariff Customers    (DCR \u002F ALMM)         Grid Stability     Households\n",[564],{"type":15,"tag":230,"props":565,"children":566},{"__ignoreMap":7},[567],{"type":21,"value":562},{"type":15,"tag":95,"props":569,"children":571},{"id":570},"_1-discom-inertia-and-net-metering-resistance",[572],{"type":21,"value":573},"1. DISCOM Inertia and Net-Metering Resistance",{"type":15,"tag":30,"props":575,"children":576},{},[577],{"type":21,"value":578},"Power distribution companies often perceive residential rooftop solar as a threat to their business model:",{"type":15,"tag":165,"props":580,"children":581},{},[582,587],{"type":15,"tag":111,"props":583,"children":584},{},[585],{"type":21,"value":586},"Residential consumers who install rooftop solar reduce their reliance on high-tariff grid draw, weakening cross-subsidization models where industrial and commercial consumers offset low domestic rates.",{"type":15,"tag":111,"props":588,"children":589},{},[590],{"type":21,"value":591},"Technical delays in net-metering installation, meter allocation, and grid feasibility approvals remain key operational bottlenecks in multiple states.",{"type":15,"tag":95,"props":593,"children":595},{"id":594},"_2-supply-chain-constraints-and-domestic-content-requirement-dcr",[596],{"type":21,"value":597},"2. Supply Chain Constraints and Domestic Content Requirement (DCR)",{"type":15,"tag":30,"props":599,"children":600},{},[601,603,608],{"type":21,"value":602},"To qualify for Central Financial Assistance, the scheme mandates strict adherence to ",{"type":15,"tag":36,"props":604,"children":605},{},[606],{"type":21,"value":607},"Domestic Content Requirements (DCR)",{"type":21,"value":609},"—requiring domestic solar cells and solar modules:",{"type":15,"tag":165,"props":611,"children":612},{},[613,618],{"type":15,"tag":111,"props":614,"children":615},{},[616],{"type":21,"value":617},"India's domestic solar cell manufacturing capacity currently lags behind module assembly capacity, leading to potential supply shortages, project delays, and higher equipment costs compared to imported alternatives.",{"type":15,"tag":111,"props":619,"children":620},{},[621,623,628],{"type":21,"value":622},"Compliance with the ",{"type":15,"tag":36,"props":624,"children":625},{},[626],{"type":21,"value":627},"Approved List of Models and Manufacturers (ALMM)",{"type":21,"value":629}," can restrict vendor choices and increase upfront system costs.",{"type":15,"tag":95,"props":631,"children":633},{"id":632},"_3-grid-integration-and-the-duck-curve-issue",[634],{"type":21,"value":635},"3. Grid Integration and the \"Duck Curve\" Issue",{"type":15,"tag":30,"props":637,"children":638},{},[639],{"type":21,"value":640},"High concentrations of distributed rooftop solar can introduce local grid instability:",{"type":15,"tag":165,"props":642,"children":643},{},[644,654],{"type":15,"tag":111,"props":645,"children":646},{},[647,652],{"type":15,"tag":36,"props":648,"children":649},{},[650],{"type":21,"value":651},"Reverse Power Flow:",{"type":21,"value":653}," Distribution transformers installed without bidirectional voltage regulators can experience voltage surges during peak mid-day solar generation.",{"type":15,"tag":111,"props":655,"children":656},{},[657,662],{"type":15,"tag":36,"props":658,"children":659},{},[660],{"type":21,"value":661},"Duck Curve Effect:",{"type":21,"value":663}," Rapid dropping off of solar generation in the late afternoon combined with spiking evening residential demand forces thermal plants to ramp up rapidly, stressing power grid flexibility.",{"type":15,"tag":95,"props":665,"children":667},{"id":666},"_4-financial-capital-barriers-for-ewslig",[668],{"type":21,"value":669},"4. Financial Capital Barriers for EWS\u002FLIG",{"type":15,"tag":30,"props":671,"children":672},{},[673],{"type":21,"value":674},"While the subsidy covers 60% of the cost for a 2 kW system, the remaining 40% out-of-pocket expenditure (plus loan servicing) can still prove prohibitive for Economically Weaker Section (EWS) and Low-Income Group (LIG) households without guaranteed steady incomes.",{"type":15,"tag":85,"props":676,"children":677},{},[],{"type":15,"tag":23,"props":679,"children":681},{"id":680},"conclusion-way-forward",[682],{"type":21,"value":683},"Conclusion \u002F Way Forward",{"type":15,"tag":30,"props":685,"children":686},{},[687,688,692],{"type":21,"value":34},{"type":15,"tag":36,"props":689,"children":690},{},[691],{"type":21,"value":40},{"type":21,"value":693}," offers a viable blueprint for democratic, decentralized clean energy expansion in India. However, unlocking its full long-term potential requires coordinated policy execution:",{"type":15,"tag":107,"props":695,"children":696},{},[697,714,731,748],{"type":15,"tag":111,"props":698,"children":699},{},[700,705,707,712],{"type":15,"tag":36,"props":701,"children":702},{},[703],{"type":21,"value":704},"DISCOM Transformation & Revenue Reform:",{"type":21,"value":706}," DISCOMs should be incentivized as facilitators rather than passive utility suppliers. Implementing ",{"type":15,"tag":36,"props":708,"children":709},{},[710],{"type":21,"value":711},"Time-of-Day (ToD) tariffs",{"type":21,"value":713}," can encourage solar self-consumption and reward rooftop owners who feed power back into the grid during peak demand hours.",{"type":15,"tag":111,"props":715,"children":716},{},[717,722,724,729],{"type":15,"tag":36,"props":718,"children":719},{},[720],{"type":21,"value":721},"Grid Modernization & Energy Storage:",{"type":21,"value":723}," Integrating ",{"type":15,"tag":36,"props":725,"children":726},{},[727],{"type":21,"value":728},"Battery Energy Storage Systems (BESS)",{"type":21,"value":730}," at the transformer level, along with smart grid technologies, can absorb excess daytime generation and mitigate duck-curve voltage fluctuations.",{"type":15,"tag":111,"props":732,"children":733},{},[734,739,741,746],{"type":15,"tag":36,"props":735,"children":736},{},[737],{"type":21,"value":738},"Scaling Domestic Cell Manufacturing:",{"type":21,"value":740}," Accelerated utilization of the ",{"type":15,"tag":36,"props":742,"children":743},{},[744],{"type":21,"value":745},"Production Linked Incentive (PLI) Scheme for High-Efficiency Solar Modules",{"type":21,"value":747}," is essential to scale integrated ingots-to-wafer-to-cell manufacturing networks, avoiding DCR-driven supply bottlenecks.",{"type":15,"tag":111,"props":749,"children":750},{},[751,756,758,763],{"type":15,"tag":36,"props":752,"children":753},{},[754],{"type":21,"value":755},"Aggregated & Community Models:",{"type":21,"value":757}," For low-income and high-density urban areas, states can introduce ",{"type":15,"tag":36,"props":759,"children":760},{},[761],{"type":21,"value":762},"Virtual Net Metering (VNM)",{"type":21,"value":764}," and community solar models, enabling apartment dwellers and landless households to subscribe to shared off-site solar facilities.",{"type":15,"tag":30,"props":766,"children":767},{},[768],{"type":21,"value":769},"By combining direct subsidies, simplified digital administration, and low-cost financing, PM Surya Ghar can serve as a core pillar in achieving India's 2030 renewable targets while supporting equitable economic growth.",{"type":15,"tag":85,"props":771,"children":772},{},[],{"type":15,"tag":23,"props":774,"children":776},{"id":775},"upsc-prelims-fact-file",[777],{"type":21,"value":778},"UPSC Prelims Fact File",{"type":15,"tag":780,"props":781,"children":782},"table",{},[783,803],{"type":15,"tag":784,"props":785,"children":786},"thead",{},[787],{"type":15,"tag":788,"props":789,"children":790},"tr",{},[791,798],{"type":15,"tag":792,"props":793,"children":795},"th",{"align":794},"left",[796],{"type":21,"value":797},"Parameter",{"type":15,"tag":792,"props":799,"children":800},{"align":794},[801],{"type":21,"value":802},"Key Details",{"type":15,"tag":804,"props":805,"children":806},"tbody",{},[807,823,839,854,870,886,902,918,934,950,966,982,998,1014],{"type":15,"tag":788,"props":808,"children":809},{},[810,819],{"type":15,"tag":811,"props":812,"children":813},"td",{"align":794},[814],{"type":15,"tag":36,"props":815,"children":816},{},[817],{"type":21,"value":818},"Scheme Name",{"type":15,"tag":811,"props":820,"children":821},{"align":794},[822],{"type":21,"value":40},{"type":15,"tag":788,"props":824,"children":825},{},[826,834],{"type":15,"tag":811,"props":827,"children":828},{"align":794},[829],{"type":15,"tag":36,"props":830,"children":831},{},[832],{"type":21,"value":833},"Type of Scheme",{"type":15,"tag":811,"props":835,"children":836},{"align":794},[837],{"type":21,"value":838},"Central Sector Scheme",{"type":15,"tag":788,"props":840,"children":841},{},[842,850],{"type":15,"tag":811,"props":843,"children":844},{"align":794},[845],{"type":15,"tag":36,"props":846,"children":847},{},[848],{"type":21,"value":849},"Nodal Ministry",{"type":15,"tag":811,"props":851,"children":852},{"align":794},[853],{"type":21,"value":73},{"type":15,"tag":788,"props":855,"children":856},{},[857,865],{"type":15,"tag":811,"props":858,"children":859},{"align":794},[860],{"type":15,"tag":36,"props":861,"children":862},{},[863],{"type":21,"value":864},"National Implementation Agency",{"type":15,"tag":811,"props":866,"children":867},{"align":794},[868],{"type":21,"value":869},"REC Limited (formerly Rural Electrification Corporation Limited)",{"type":15,"tag":788,"props":871,"children":872},{},[873,881],{"type":15,"tag":811,"props":874,"children":875},{"align":794},[876],{"type":15,"tag":36,"props":877,"children":878},{},[879],{"type":21,"value":880},"Financial Outlay",{"type":15,"tag":811,"props":882,"children":883},{"align":794},[884],{"type":21,"value":885},"₹75,021 Crore",{"type":15,"tag":788,"props":887,"children":888},{},[889,897],{"type":15,"tag":811,"props":890,"children":891},{"align":794},[892],{"type":15,"tag":36,"props":893,"children":894},{},[895],{"type":21,"value":896},"Target Beneficiaries",{"type":15,"tag":811,"props":898,"children":899},{"align":794},[900],{"type":21,"value":901},"1 Crore (10 Million) Residential Households",{"type":15,"tag":788,"props":903,"children":904},{},[905,913],{"type":15,"tag":811,"props":906,"children":907},{"align":794},[908],{"type":15,"tag":36,"props":909,"children":910},{},[911],{"type":21,"value":912},"Target Electricity Benefit",{"type":15,"tag":811,"props":914,"children":915},{"align":794},[916],{"type":21,"value":917},"Up to 300 Units of free electricity per month",{"type":15,"tag":788,"props":919,"children":920},{},[921,929],{"type":15,"tag":811,"props":922,"children":923},{"align":794},[924],{"type":15,"tag":36,"props":925,"children":926},{},[927],{"type":21,"value":928},"Target Capacity Addition",{"type":15,"tag":811,"props":930,"children":931},{"align":794},[932],{"type":21,"value":933},"30 GW of Residential Rooftop Solar",{"type":15,"tag":788,"props":935,"children":936},{},[937,945],{"type":15,"tag":811,"props":938,"children":939},{"align":794},[940],{"type":15,"tag":36,"props":941,"children":942},{},[943],{"type":21,"value":944},"Subsidy Structure (Up to 2 kW)",{"type":15,"tag":811,"props":946,"children":947},{"align":794},[948],{"type":21,"value":949},"₹30,000 per kW (60% of benchmark cost)",{"type":15,"tag":788,"props":951,"children":952},{},[953,961],{"type":15,"tag":811,"props":954,"children":955},{"align":794},[956],{"type":15,"tag":36,"props":957,"children":958},{},[959],{"type":21,"value":960},"Subsidy Structure (2 kW to 3 kW)",{"type":15,"tag":811,"props":962,"children":963},{"align":794},[964],{"type":21,"value":965},"₹18,000 for the additional kW (40% of benchmark cost)",{"type":15,"tag":788,"props":967,"children":968},{},[969,977],{"type":15,"tag":811,"props":970,"children":971},{"align":794},[972],{"type":15,"tag":36,"props":973,"children":974},{},[975],{"type":21,"value":976},"Maximum Subsidy Cap",{"type":15,"tag":811,"props":978,"children":979},{"align":794},[980],{"type":21,"value":981},"₹78,000 (for systems $\\ge$ 3 kW)",{"type":15,"tag":788,"props":983,"children":984},{},[985,993],{"type":15,"tag":811,"props":986,"children":987},{"align":794},[988],{"type":15,"tag":36,"props":989,"children":990},{},[991],{"type":21,"value":992},"GHS\u002FRWA Subsidies",{"type":15,"tag":811,"props":994,"children":995},{"align":794},[996],{"type":21,"value":997},"₹18,000 per kW for common utilities (up to 500 kW)",{"type":15,"tag":788,"props":999,"children":1000},{},[1001,1009],{"type":15,"tag":811,"props":1002,"children":1003},{"align":794},[1004],{"type":15,"tag":36,"props":1005,"children":1006},{},[1007],{"type":21,"value":1008},"Mandatory Compliance",{"type":15,"tag":811,"props":1010,"children":1011},{"align":794},[1012],{"type":21,"value":1013},"Domestic Content Requirement (DCR) for solar cells and modules",{"type":15,"tag":788,"props":1015,"children":1016},{},[1017,1025],{"type":15,"tag":811,"props":1018,"children":1019},{"align":794},[1020],{"type":15,"tag":36,"props":1021,"children":1022},{},[1023],{"type":21,"value":1024},"Key Special Feature",{"type":15,"tag":811,"props":1026,"children":1027},{"align":794},[1028],{"type":21,"value":1029},"Creation of 1 Model Solar Village per district",{"title":7,"searchDepth":1031,"depth":1031,"links":1032},2,[1033,1034,1039,1044,1049,1055,1056],{"id":25,"depth":1031,"text":28},{"id":90,"depth":1031,"text":93,"children":1035},[1036,1038],{"id":97,"depth":1037,"text":100},3,{"id":148,"depth":1037,"text":151},{"id":220,"depth":1031,"text":223,"children":1040},[1041,1042,1043],{"id":236,"depth":1037,"text":239},{"id":329,"depth":1037,"text":332},{"id":358,"depth":1037,"text":361},{"id":410,"depth":1031,"text":413,"children":1045},[1046,1047,1048],{"id":416,"depth":1037,"text":419},{"id":476,"depth":1037,"text":479},{"id":519,"depth":1037,"text":522},{"id":551,"depth":1031,"text":554,"children":1050},[1051,1052,1053,1054],{"id":570,"depth":1037,"text":573},{"id":594,"depth":1037,"text":597},{"id":632,"depth":1037,"text":635},{"id":666,"depth":1037,"text":669},{"id":680,"depth":1031,"text":683},{"id":775,"depth":1031,"text":778},"markdown","content:current-affairs:pm-surya-ghar-muft-bijli-yojana.md","content","current-affairs\u002Fpm-surya-ghar-muft-bijli-yojana.md","current-affairs\u002Fpm-surya-ghar-muft-bijli-yojana","md"]